BELARE 2007-2008: Setting Foot at Utsteinen
Drilling on the Ridge - Drilling rig on superposed granite blocks making up the ridge - the snow has been cleared to build the garage, thus exposing the rock face. Drilling equipment arrived on the 16th of November, and work has begun on the first anchor points.



