Skip to main content
Globe Lines

international
polar
foundation

subline
Filter
Installing Roof Panels
png - 2.38 MB
Princess Elisabeth Antarctica Research Station
2025
Installing Roof Panels
Large wooden panels are lifted into place to form the roof of the new hangar.
Unloading Heavy Materials
png - 2.7 MB
Princess Elisabeth Antarctica Research Station
2025
Unloading Heavy Materials
Heavy construction materials are unloaded using a crane to support the next phase of the build.
Unloading Heavy Materials
png - 2.7 MB
Princess Elisabeth Antarctica Research Station
2025
Unloading Heavy Materials
Heavy construction materials are unloaded using a crane to support the next phase of the build.
Preparing the Construction Site
png - 2.5 MB
Princess Elisabeth Antarctica Research Station
2025
Preparing the Construction Site
All materials and tools are prepared on site to continue the hangar’s structural build at the Winter Park.
Hangar and Solar Power System
png - 3.03 MB
Zero Emission Target Philosophy
2025
Hangar and Solar Power System
A side view of the Perseus hangar, where solar panels will provide renewable electricity during operations.
Preparing the Construction Site
png - 2.5 MB
Princess Elisabeth Antarctica Research Station
2025
Preparing the Construction Site
All materials and tools are prepared on site to continue the hangar’s structural build at the Winter Park.
Inside the Perseus Hangar
png - 2.79 MB
Princess Elisabeth Antarctica Research Station
2025
Inside the Perseus Hangar
Inside the hangar, which also functions as a control tower to monitor weather conditions and support flight operations.
Inside the Perseus Hangar
png - 2.79 MB
Princess Elisabeth Antarctica Research Station
2025
Inside the Perseus Hangar
Inside the hangar, which also functions as a control tower to monitor weather conditions and support flight operations.
Opening the Hangar Doors
png - 2.92 MB
Princess Elisabeth Antarctica Research Station
2025
Opening the Hangar Doors
The hangar doors are opened for the first time this season, marking the start of airfield operations.