Princess Elisabeth Antarctica Research Station
2008
Covered in Snow and Digging Ourselves Out
Upon their arrival at Utsteinen, the members of BELARE 2008-2009 found the entrance to the garage covered by huge piles of snow. The same was true for everything else left outside from last year's expedition. The snow in front of ...
Zero Emission Target Philosophy
2008
Arrival at Utsteinen
The BELARE 2008-2009 expedition has now truly begun. The footage in this short movie was filmed upon arriving at Utsteinen. Alain Hubert opens the station's front door for the first time in eight months. In his speech, Alain reite...
Zero Emission Target Philosophy
2008
Arrival at Utsteinen
The BELARE 2008-2009 expedition has now truly begun. The footage in this short movie was filmed upon arriving at Utsteinen. Alain Hubert opens the station's front door for the first time in eight months. In his speech, Alain reite...
Zero Emission Target Philosophy
2008
Arrival at Utsteinen
The BELARE 2008-2009 expedition has now truly begun. The footage in this short movie was filmed upon arriving at Utsteinen. Alain Hubert opens the station's front door for the first time in eight months. In his speech, Alain reite...
Zero Emission Target Philosophy
2008
Arrival at Utsteinen
The BELARE 2008-2009 expedition has now truly begun. The footage in this short movie was filmed upon arriving at Utsteinen. Alain Hubert opens the station's front door for the first time in eight months. In his speech, Alain reite...
Zero Emission Target Philosophy
2008
Arrival at Utsteinen
The BELARE 2008-2009 expedition has now truly begun. The footage in this short movie was filmed upon arriving at Utsteinen. Alain Hubert opens the station's front door for the first time in eight months. In his speech, Alain reite...
Zero Emission Target Philosophy
2008
Princess Elisabeth Station Mock-Up: Assembling the Ventilation System
A scaled mock-up of the Princess Elisabeth station's technical core was built at Laborelec (research centre of the group GDF SUEZ) in Linkebeek. For the past three and a half months, the technical systems allowing the station to r...
Zero Emission Target Philosophy
2008
Princess Elisabeth Station Mock-Up: Assembling the Ventilation System
A scaled mock-up of the Princess Elisabeth station's technical core was built at Laborelec (research centre of the group GDF SUEZ) in Linkebeek. For the past three and a half months, the technical systems allowing the station to r...
Zero Emission Target Philosophy
2008
Princess Elisabeth Station Mock-Up: Assembling the Ventilation System
A scaled mock-up of the Princess Elisabeth station's technical core was built at Laborelec (research centre of the group GDF SUEZ) in Linkebeek. For the past three and a half months, the technical systems allowing the station to r...